Meeting details

Planning Commission

Held at Board Chambers

Thursday, 07/11/2019

From 9:00 AM to 5:00 PM

Participants
Name Function
Jay Brown Commissioner
James Harrison Commissioner
Dawn Ortiz-Legg Commissioner
Mike Multari Commissioner
Don Campbell Commissioner
Attachments
Name Download Ext. Filesize
Correspondence received at Meeting pdf 5 MB
Meeting files:
Legend:
Private invitation
Agenda package
Agenda item details
Video link

Minutes

PUBLIC COMMENT PERIOD
1
Members of the public wishing to address the Commission on matters other than scheduled items may do so at this time, when recognized by the Chairman. Presentations are limited to three minutes per individual.
PLANNING STAFF UPDATES
2
This is the time set for Planning Staff updates.
CONSENT AGENDA:
3
May 23, 2019 draft Planning Commission minutes
Planning Commission 58/2019
4
June 13, 2019 draft Planning Commission minutes
Planning Commission 59/2019
5
June 27, 2019 draft Planning Commission minutes
Planning Commission 60/2019
HEARINGS: (Advertised for 9:00 a.m.)
6
Hearing to consider a request by Larry Nasareno Montenegro Delgado for a Conditional Use Permit (DRC2017-00108) to establish three acres of outdoor (hoop house) cannabis cultivation and 22,000 square feet of indoor cannabis cultivation with an indoor ancillary nursery and ancillary processing, 77,657 square feet of outdoor commercial cannabis nursery, 28,800 square feet of indoor commercial cannabis nursery, and indoor non-volatile cannabis manufacturing on an approximately 42-acre site. Processing would include activities such as drying, curing, trimming, and packaging of product grown on site. Project development would include installation of hoop houses, construction of two greenhouses (57,600 square feet total), and construction of a 6,000-square-foot building for processing and manufacturing activities. Three 864-square-foot temporary office trailers are also proposed. The operation would cover approximately ten acres and result in 2.5 acres of site disturbance. The project includes a modification from the parking standards set forth in Land Use Ordinance (LUO) Section 22.18.050.C.1 to reduce the required number of spaces from 125 to 19 and a modification from the setback provisions set forth in LUO Section 22.40.050.D.3.b to reduce the outdoor cultivation setbacks from the western property line from 300 feet to 30 feet, and from the eastern property line from 300 feet to 258 feet. The project site is located at 8380 Carrisa Highway in the Carrizo Planning Area. Also to be considered at the hearing will be adoption of the Environmental Document prepared for the item. The Environmental Coordinator, after completion of the initial study, finds that there is no substantial evidence that the project may have a significant effect on the environment, and the preparation of an Environmental Impact Report is not necessary. Therefore, a Mitigated Negative Declaration (pursuant to Public Resources Code Section 21000 et seq., and CA Code of Regulations Section 15000 et seq.) has been issued on February 27, 2019 for this project. Mitigation measures are proposed to address Air Quality and Biological Resources and are included as conditions of approval.The Environmental Document is available for public review at the Department of Planning and Building, at the below address. A copy of the Environmental Document is also available on the Planning and Building Department website at www.sloplanning.org. Anyone interested in commenting on the proposed Environmental Document should submit a written statement and/or speak at the public hearing. Comments will be accepted up until completion of the public hearing(s).

County File Number: DRC2017-00108 Date Accepted: June 28, 2018
Assessor Parcel Numbers: 072-301-007 Project manager: Megan Martin
Supervisorial District: 5 Recommendation: Approve
Planning Commission 61/2019
7
Continued hearing to consider a request by Bill Lee for a Minor Use Permit / Coastal Development Permit (DRC2017-00094) to allow encroachments (as-built) into the road right-of-way of First Street including: 20 feet of landscaping along the length of the eastern portion of the road, and the extension of an approximately 86-foot-long (5-feet-wide) coastal access boardwalk (connecting to the boardwalk which fronts the bayfront at the Back Bay Inn). The project will result in a disturbance of approximately 6000 square feet of First Street (an 80-foot-wide right-of-way). The project is located on First Street, adjacent to the Residential Single-Family land use category to the west and the Commercial Retail land use category to the east. The project site is south of Santa Maria Avenue extending to Morro Bay, in the community of Los Osos. The project site is located within the in Estero Planning Area. Also to be considered is the environmental determination that the project is categorically exempt under CEQA, pursuant to CEQA Guidelines Section 15061(b)(2). A Notice of Exemption has been prepared pursuant to CEQA Guidelines Section 15062. CONTINUED FROM 9/27/18.

County File Number: DRC2017-00094 Assessor Parcel Numbers: Road right-of-way
Supervisorial District: 2 Date Accepted: August 15, 2018
Project Manager: Kerry Brown Recommendation: Approval
Planning Commission 62/2019
ADJOURNMENT
8