Agenda item details

Phillips 66 DRC2012-00095 Development Plan/Coastal Development Permit

Number:
PLC 5/2016
Department:
Planning and Building
Description:
A request by the PHILLIPS 66 COMPANY for a Development Plan/Coastal Development Permit to allow the modification of the existing rail spur currently on the southwest side of the Santa Maria Refinery in order to allow for the import/unloading of crude oil at the refinery via train. The rail spur project includes a 6,915-foot long rail spur, an unloading facility, onsite pipelines, replacement of coke rail loading tracks, the construction of five parallel tracks with the capacity to hold a 5,190-foot-long unit train consisting of 80 tank cars (60 feet each), two buffer cars (60 feet each), and three locomotives (90 feet each), and accessory improvements outlined in more detail below in the staff report as well as the Final Environmental Impact Report (FEIR). The site is in the South County Coastal Planning Area, in the Industrial Land Use Category, and is located at 2555 Willow Road, approximately 3 miles west of the Nipomo Urban Reserve Line and approximately 3,300 feet from the nearest residence. Also being considered is the FEIR.

County File Number: DRC2012-00095
Assessor Parcel Numbers: 092-401-011, 092-401-013, 092-401-005, & 092-411-005
Supervisorial District: 4 Date Accepted: July 12, 2013
Project Manager: Ryan Hostetter Recommendation: Denial
Attachments
Name Download Ext. Filesize
ORDER OF THE DAY pdf 199 kB
Exhibit A - Project Analysis, General Plan and Ordinance Inconsistencies "Onsite" pdf 218 kB
Exhibit B - Project Analysis, General Plan and Ordinance Inconsistencies "Mainline" pdf 185 kB
Exhibit C - Findings for Denial pdf 287 kB
Exhibit D - California Coastal Commission Site Visit Letter pdf 396 kB
Exhibit E - Project Graphics pdf 1 MB
Exhibit F - Post Comment Period Agency & Special District Comment List pdf 156 kB
Exhibit G - USDOT Rail Car Specifications and Risk Levels pdf 328 kB
Exhibit H - Agencies and Individuals Consulted During EIR pdf 158 kB
Exhibit I - Crude by Rail Accident Table pdf 176 kB
Exhibit J - Correspondence from the Applicant and UPRR Regarding Federal Preemption pdf 3 MB
Exhibit K - Detailed Reduced Rail Delivery Comparisons pdf 169 kB
Commissioners ex-parte email contacts. pdf 160 kB
Phillips 66_2-4-16 Power Point presentation pdf 3 MB
Speaker slips Part 1 pdf 18 MB
Speaker slips Part 2 pdf 13 MB
Correspondence taken into the record at the meeting Part 1 pdf 8 MB
Correspondence taken into the record at the meeting Part 2 pdf 2 MB
Correspondence taken into the record at the meeting Part 3 pdf 11 MB
Correspondence taken into the record at the meeting Part 4 pdf 12 MB
Correspondence taken into the record at the meeting Part 5 pdf 22 MB
Correspondence taken into the record at the meeting Part 6 pdf 13 MB
Correspondence taken into the record at the meeting Part 7 pdf 16 MB
Correspondence taken into the record at the meeting Part 8 pdf 10 MB
Correspondence taken into the record at the meeting Part 9 pdf 1 MB
Discussed at meetings:
Meeting PLC - 29/2016, Point 3 on 2/4/2016 by Planning Commission
Agenda item